DLKV (Dalekovod d.d.)

Naslovnica Forum Tržište kapitala Hrvatska DLKV (Dalekovod d.d.)

Forum namijenjen svim temama vezanim za dionice, obveznice i druge vrijednosne papire te trgovanje istima u Hrvatskoj.
Zadnja izmjena 06.11.2024. u 01:24
OznakaVrijednostPrometKoličinaKupovnaProdajnaPromjena
DLKV
3,65
7.233
1,981
3,64
3,66
1,67%
Podaci su preuzeti sa ZSE uz odgodu od 15 minuta.

čini se da je na 130 dosta ozbiljan otpor, oni koji misle da je 130 dno sad kupuju po 132-133 dok ima količine

Blue Horseshoe loves Anacott Steel (moje postove shvatite kao moje osobno razmišljanje, ne kao nagovor na kupnju ili prodaju)

Gdje ćemo se naoružati i čime?
http://www.vecernji.hr/vijesti/plodni-cacicevi-dani-moskvi-rusi-nude-madarske-mig-ove-29-clanak-397789

Google prevoditelj:

http://translate.google.hr/translate?hl=hr&sl=sq&u=http://lajme.shqiperia.com/lajme/artikull/iden/1047220680/titulli/Linja-me-Kosoven-OST-anulon-tenderin-acarohen-gjermanet&ei=mg6LT7KjMY2N4gTZ0aDTCQ&sa=X&oi=translate&ct=result&resnum=8&ved=0CFUQ7gEwBzjeAQ&prev=/search%3Fq%3Ddalekovod%2B15.04.2012.%26start%3D222%26hl%3Dhr%26sa%3DN%26biw%3D1152%26bih%3D562%26prmd%3Dimvns

Dalekovod dd iz Zagreba, 20. veljače 2012, poslao je pismo od operatora prijenosnog sustava (OPS), izražavajući zabrinutost da bi, kako je najavljeno u studenom prošle godine najavljeno je najpovoljnijeg ponuditelja za izgradnju linije interkonieksionit Albanija-Kosovo, tri i pol mjeseca nakon što to nije bacanje bilo koji drugi korak kako napreduje projekt, prema OST marrëveshjejve Kosovu i operatora (KOSTT) do fond KfW njemačke suradnje vlade.
Hrvati najavljuju da su dobili odgovarajuće pripremne mjere u vezi s financijskom aspektu, dodjelu i rezervaciju značajnih sredstava za aktivnosti vezane za projektiranje, proizvodnju i izgradnju.
To su nam puno koštati, kao tvrtka, navodi u svom pismu Luke Miličiću, predsjedniku Uprave.

Koliko se može shvatiti iz ovog prijevoda preko google prevoditelja Dalekovod je još u studenom prošle
godine dobio potvrdu da je najbolji ponuditelj za izgradnju dalekovoda Albanija-Kosovo (Tirana-Priština), a kako do danas još nisu potpisali ugovor L.Miličić je u ime Dalekovoda poslao pismo u kojem
ih na to upozorava.


Google prevoditelj:

http://translate.google.hr/translate?hl=hr&sl=sq&u=http://lajme.shqiperia.com/lajme/artikull/iden/1047220680/titulli/Linja-me-Kosoven-OST-anulon-tenderin-acarohen-gjermanet&ei=mg6LT7KjMY2N4gTZ0aDTCQ&sa=X&oi=translate&ct=result&resnum=8&ved=0CFUQ7gEwBzjeAQ&prev=/search%3Fq%3Ddalekovod%2B15.04.2012.%26start%3D222%26hl%3Dhr%26sa%3DN%26biw%3D1152%26bih%3D562%26prmd%3Dimvns

Dalekovod dd iz Zagreba, 20. veljače 2012, poslao je pismo od operatora prijenosnog sustava (OPS), izražavajući zabrinutost da bi, kako je najavljeno u studenom prošle godine najavljeno je najpovoljnijeg ponuditelja za izgradnju linije interkonieksionit Albanija-Kosovo, tri i pol mjeseca nakon što to nije bacanje bilo koji drugi korak kako napreduje projekt, prema OST marrëveshjejve Kosovu i operatora (KOSTT) do fond KfW njemačke suradnje vlade.
Hrvati najavljuju da su dobili odgovarajuće pripremne mjere u vezi s financijskom aspektu, dodjelu i rezervaciju značajnih sredstava za aktivnosti vezane za projektiranje, proizvodnju i izgradnju.
To su nam puno koštati, kao tvrtka, navodi u svom pismu Luke Miličiću, predsjedniku Uprave.

Koliko se može shvatiti iz ovog prijevoda preko google prevoditelja Dalekovod je još u studenom prošle
godine dobio potvrdu da je najbolji ponuditelj za izgradnju dalekovoda Albanija-Kosovo (Tirana-Priština), a kako do danas još nisu potpisali ugovor L.Miličić je u ime Dalekovoda poslao pismo u kojem
ih na to upozorava.

i sad se oni svi buju preplašili i brzo će avansirati 100% i još će potpisati anex ugovora za 200%. S tim tamo majstorima im je i bolje da nemaju posla

14% glasača je glasalo protiv ulaska u EU ....

@
sveps
S tim tamo majstorima im je i bolje da nemaju posla
___________________

Znaš li uopće tko financijski stoji iza tog projekta?

http://www.energyobserver.com/vesti.php?lang=1&ID=31954

Zar može bolje?

VIJESTI
27.03.2012.

TVORNICA „DALEKOVOD TKS DOBOJ“ U NAREDNE DVIJE GODINE PLANIRA OTVORITI PREKO 200 NOVIH RADNIH MJESTA

U tvornici „Dalekovod TKS Doboj“ imaju vrlo ambiciozne planove da u naredne dvije godine povećaju broj zaposlenih sa 210 na oko 450. Najviše novih radnih mjesta bit će otvoreno u savremenoj cinkaoni koja se gradi na temeljima stare koja je ovdje radila do 1992. godine.

http://www.regija.ba/contents/1958

Napravi razliku http://pravipotez.blogspot.com/


@
sveps
S tim tamo majstorima im je i bolje da nemaju posla
___________________

Znaš li uopće tko financijski stoji iza tog projekta?

http://www.energyobserver.com/vesti.php?lang=1&ID=31954

Zar može bolje?

pa može bolje, bilo bi bolje da su to već potpisali i počeli raditi. Samo tko zna koje su uvjete obje strane trebale ispuniti da bi se kredit realizirao.

14% glasača je glasalo protiv ulaska u EU ....

16.4.2012
The Albanian Prime Minister, Sali Berisha, is accused of cooperation with the Serbian mafia in the energy sector, with affairs that have damaged Kosovo.

An article published on the Kosovo daily newspaper “Zeri” says that for more than one year, Prime Minister Berisha has blocked the 400 KV project that connects Albania with Kosovo.

The blocking of this project has secured Serbia a monopoly in Kosovo’s energy market, as the only way to secure power supply.

The newspaper quotes that the Serbian businessmen, Vuk Hamovic, one of the richest people in Balkan and who operates in this business together with Damir Fazlic, have met in Vienna, Austria, with the Prime Minister’s son, Shkelzen Berisha.

“The Serbian businessmen have paid high rank Albanian officials for blocking the construction of this power line”, Zeri sources have declared.

The tender for the Albania-Kosovo 400 KV power line construction was opened on March 2011. This project is financed by the German Bank for Construction and it would make Kosovo independent from the Serbian power lines.

“Zeri” writes that the companies that participated in the regular procedures of this tender were “Dalekovod” from Croatia and “Energo Invest” from Bosnia and Herzegovina.

“Dalekovod” is a very successful company that has successfully finalized the Elbasan-Podgorica power line, with a 400 KV capacity.

After the commission’s assessment, in which were present officials from the Transmission System Operator, the System Operator, the Transmission and Power Market operation in Kosovo and the German consulent, Intesh Gopa, the winner of the tender was declared the Croatian company Dalekovod.

According to Zeri, this project remained untouched after the appointment of the new director of Transmission System Operator, a former bodyguard of Sali Berisha and also former director of the Durres Customs, Arben Ibro.

Ibro has been instructed by Sali Berisha to block the project. This has concerned the German Bank for Development, which has expressed its concern on a letter sent to the Ministry of Finances on December 2011.

“We are concerned about the delays in the process that will grant the contract to the best offer for these two big energy projects. Although the final project reports have been sent weeks ago for both projects, TSO has not given a final decision and the negotiations for the agreements have been delayed, as result”, says the letter of the German Bank for Development director, Roland Siller.

Siller also asks the Albanian government to review the matter and guarantee that the process would not delay any longer. The German Bank directors have written to the Albanian government on 7 February 2012.

In this letter they have mentioned that the delays with the project will cause extra expenses, but according to Zeri, there has been no reply. The daily newspaper quotes its sources saying that the Albanian authorities have never answered to the German Bank for Development.

Some of the complaints have also come from the winning company, Dalekovod, from Croatia. In a letter sent to the TSO, the officials of this company say that there is nothing related with the project for which this company was declared winner, for more than 3 months and a half.

Naço: We postponed tender. Opposition: Delay favors Serbs
The Minister of Energy, Nasip Naco, admitted that the tender for the power line that connects Albania with Kosovo has been postponed, and he explains the reasons:
“The tender was made a few moths ago. The contracting authority was not ready to sign the agreement, thinking that the reference terms had problems. We discussed it at the Ministry of Economy and TSO, and a more qualified solution will be given in the days to come”, Minister Naco declared.

Vaš link

Ignore : renči

http://translate.google.hr/translate?hl=hr&sl=en&u=http://www.top-channel.tv/english/artikull.php%3Fid%3D5464&ei=2GGOT8HpC8XJtAbc0IzwCQ&sa=X&oi=translate&ct=result&resnum=1&ved=0CCMQ7gEwAA&prev=/search%3Fq%3DBerisha,%2Baffairs%2Bwith%2Bthe%2BSerbian%2Bmafia%26hl%3Dhr%26prmd%3Dimvnsb

Au, što se ovdje zakuhalo. Dalekovod pobjedio na natječaju, a OPS odlučio samoinicijativno da želi
posao dodjeliti Energoinvestu. Međutim, malo su se previše zaigrali, jer pita se i onaj koji daje pare,
(KfW) a on kaže ovo:
Ova odluka nije pozdravio od strane njemačke banke, koja se bavila OPS direktora s dopisom sljedeći dan, rekavši da oni ne bi korist drugog društva. KFW kaže da ponuda "Energoinvest" je financijski manje i da su postupci pokazali hrvatsku Dalegovod kao pobjednik, jer je ponudila veću tehničku guarantees

Evo pravog teksta:
Google prevoditelj:
Kosovo-Albanija Powerline skandal
17/04/2012 17/04/2012
Natječaj za Kosovo-Albanija dalekovoda odgođen generalni direktor Operatora prijenosnog sustava (OPS), Arben Ibro.
Barem to dolazi kao rezultat službene korespondencije koju Top Channel.
Korespondencija, kaže da je projekt započeo ožujka 2011, kada je natječaj za novi projekt je održan, što je rezultiralo s dva pobjedničkih poduzeća, hrvatskim Dalekovo i bosanski Energoinvest.
Nakon natječaja, verifikacija ponuda nastavile s tri sljedeća faza, koja vrši kontrolu na kvalifikacije, tehničke i financijske eligibilities, sve od njih održana je 22. kolovoza i 20. rujna 2011, kao dokument njemačke KFW banke pokazuje. Nakon ove faze je OPS predstavnici s Kosova i Albanije proglasili su Društvo hrvatskih Dalekovod kao pobjednik, koji je izabran za tehničke jamstava, iako je dobio manje bodova nego društva u drugom mjesto, Entergoinvest.
Dana 3. studenog 2011, natječaj savjetnik obavijestila hrvatsku tvrtku da su uzeti u obzir pobjednici, ali 8. veljače 2012, OPS directror, ​​Arben Ibro, prijavio KfW da je odlučio da pregovaraju s drugom pobjednički tvrtke, bosanski Energoinvest.
Ova odluka nije pozdravio od strane njemačke banke, koja se bavila OPS direktora s dopisom sljedeći dan, rekavši da oni ne bi korist drugog društva. KFW kaže da ponuda "Energoinvest" je financijski manje i da su postupci pokazali hrvatsku Dalegovod kao pobjednik, jer je ponudila veću tehničku guarantees.N Iz tog razloga, u skladu s KfW, Ibro kaže da OPS rješenje za proglašenje Bosance kao pobjednici nije u skladu s KfW uputama.
Nasip NACO uputio je pismo gospodinu Ivi Kason, 20. veljače, kao i ravnatelj Inner inspekcijske i borbu protiv korupcije, na Vijeću ministra, a on je svjestan ovog pisma premijer Berisha, ministar financija, Bode, dn OPS redatelj, Arben Ibro.
NACO piše o pismu koje OPS rješenje za promjenu tendersku pobjednik je neprofesionalno i neprihvatljivo.

Hajde stisnite malo prodavači kupujem na 120 kuna budite hrabri pa ponudite.

17.2.2012

Izgleda da samo Albanci zezaju al po svemu cini se da Njemci vode glavnu rijec 🙂

Thaci, no comment on Kosovo-Serbia powerline

When asked about the scandal with the Kosovo-Albania power line delays, reported on Monday by the daily Kosovo newspaper “Zeri”, Prime Minister Hashim Thaci preferred to not comment it, saying only that Prishtina is following its own agenda for the construction of this line.

“I want to have detailed information before giving my opinion about this case. As regards the Kosovo institutions, we are fully respecting the agenda, hence I can speak only about the relations and responsibilities of the Kosovo government, which we are fulfilling”, Thaci declared, avoiding the concrete answer if he was informed by the Albanian side about what had happened.

The Director of the Transmission System Operator of Kosovo, Naim Bejtullahu, asked indirectly for the agreements that are signed with Germany to be respected, due to the obligations that both parties have to the German bank.

Bejtullahu did not comment the article written by Zeri, and he expressed his reservation about the responsibilities of the Albanian side on this project.

But he added that since the financing of this project is the German Bank for development, the parties have agreed to exploit the procurement procedures of this bank, which have not concluded yet.

Asked if the German Development Bank has complained about the delays, Bejtullahu declared: “We have no such information from the German Bank”.

The Kosovo TSO officials say that they have no information for the fact that this project has been delayed. However, the vice director admits that there are several delays, which are very complex, since the project costs 70 million EUR.

Vaš link

Ignore : renči

New Report

Close